CSJV POWRA Version 1.0 Logo
  • Register your Cascade / PoWRA 

    If there is a  Change to the task, environment or interfaces stop work and complete a PoWRA. Providing the change can be done without effect the risk profile the change and control measure can be written onto the TBS change section. once done it must be briefed to the opertives carrying out the work and they will sign the briefing sheet. Final stage requires the change section and sign off sheet to be captured on this form and submitted electronically

    If there are No changes to the task, environment or interfaces and you are satisfied the TBS is adequate please select NO CHANGES from the choice below.

  • By selecting no change you are confirming that the TBS is of sufficiant detail and relevent for the task it was written for.  



  • Note: you will be emailed a copy of this form once you submit it.

  • Should be Empty: